top of page

Photo Galleries

 
San Miguel Brewery-Davao


The over-all electrical construction of SMC Davao Brewery in 1994-1996 was under the direct supervision of Engr. D.A. Amora, then Electrical Engineering Manager of SMBG, now Chief operating Officer of PEPSCOR. The brewery was completed in a world record of 17 months (from the drawing board to the first bottling production batch). The brewery with a capacity of 2.0 million hectoliters per year is powered by 2 x 5.0 MVA, 69 - 4.16 KV Looped Primary - Secondary Selective Substations with back-up generating capacity  of 3 x 2.0 MVA Diesel Generating Sets complete with PLC driven fully automatic paralleling with TRANSCO grid. The facility is complete with a Brewhouse, a Filtration/Cellaring/Beer Processing Plant, a Two-Line Bottling Plant, Steam & Refrigeration Plant, CO2 Recovery Plant, Water Treatment Plant, Waste Water Treatment Plant, Training Center and an Administration Building. 

 
The Globalization of the Filipino Electrical Engineer
 
CESEEPS INTERNATIONAL ASSN., INC. is a SEC-registered non-stock, non-profit corporation whose mission is focused in building-up the competencies of electrical engineers in this part of the globe. CESEEPS is the acronym for CENTRE FOR STUDIES IN ELECTRICAL ENGINEERING PRACTICES & STANDARDS.

Bannering the all-time theme, “The Globalization of the Filipino Electrical Engineer”;CESEEPS International, as a Training Centre aims to catalyze the engineer in developing himself into a world-class and globally competitive technocrat.
 
Slide Photos: Participants from all over Industrial Plants in VisMin during their series of seminars. In the photo: Engr. D.A. Amora / Engr. Noel. Fernandez  (Chief Lecturers of CESEEPS. 


 

  • facebook-square
  • Twitter Square
  • google-plus-square

By:  MAA YT101.  Proudly created with Wix.com

bottom of page