BFBL-HA New Policy on Contruction Cash Bond and or Deposit / and Materials Handling and Delivery during construction period:  

 

BFBL-HA will establish construction cash bond or deposit from time to time.  This deposit is intended to discourage Deed of Restriction violations.  However, in case of violation, the deposit shall cover the fines that may be imposed for any violation of the Deed of Restrictions, rules or regulations governing construction projects and personnel or for damages to property that may have been caused in the course of constructing the proposed building, regardless of whether these violations/ damages were committed/caused by the member, his employees, contractors, sub-contractors, suppliers or their representatives/ employees.


The Owner’s Bond or Deposit shall be refunded after deductions for fines or damages. This will be refunded in full to the member without interest when the residential house or improvement is 100% completed provided no BFBL-HA rules, relating to the construction or otherwise, are violated. 

 

Materials Handling and Delivery:

 

Delivery of construction materials should be made only between 8:30 a.m. to 4:00 p.m., Mondays to Saturdays.  

 

Any damage to curbs, gutters, roadways, drainage system, sidewalks, manholes, trees or any other property within BFBL resulting from the delivery or handling of construction materials or equipment will be the sole responsibility of the homeowner/contractor and the expenses incurred to repair and restore such damage/s will be for the account of said homeowner/contractor.


Construction materials, tools and equipment must be properly stored and secured within the property of the builder-member or building contractor.  BFBL will not be responsible for any loss or damage to the construction materials, tools and equipment.


The streets and easements must not be used for construction activities.

 

Safety, housekeeping and sanitation


All new construction and major house repair/s must be covered and enclosed with dust curtains or sheets or walls to shield adjoining residents from pollutants coming from sanders, sawdust, paints, etc. and other miscellaneous debris.


Every construction site must be provided with a covered toilet facility and other sanitation conveniences within the property which should be kept sanitary at all times by covering the same with lime and earth at frequent intervals.


The homeowner/contractor should ensure that all construction materials and supplies, particularly toxic chemicals, inflammable paints and solvents, are safely handled and stored. All debris, garbage and refuse are properly disposed of and not allowed to litter the streets.